big-slider-02

INSTALLATION AT SITE

Kimia Novin Paya has a successful background of construction and installation for the packages and equipment which to be installed at site such as storage tanks, air cooled heat exchangers and most of process units and packages.

For instance Kimia Novin Paya Storage tank construction process is divided into semi precast and on-site installation of two parts.

Semi-finished products: the bottom of the tank, the tank wall prefabricated, tank top and other components are prefabricated

On the spot installation method: divided into flip chip construction technology, construction technology and special formal construction technology.

All required considerations are mentioned in Kimia Novin Paya installation & operation manual such as foundation design and construction process, excavation of foundation pit, Reinforced concrete, Earthwork backfilling and compaction of backfill soil, sand blast, and Slope protection construction.

  • All the equipment and units supplied by Kimia Novin Paya will be installed by qualified personnel who have solid understanding of system design, pressure and temperature ratings, and piping assembly.
  • The service conditions of the system prior to applying any shell & tube heat exchanger are verifies.
  • The installation plan would be executed to meet the requirements indicated on the piping installation diagram as client’s specification.

The indicated port assembly sequence in the Kimia Novin Paya diagram maximizes the performance, and minimizes the possibility of thermal shock. In instances where the fluids are required to be reversed, hot fluid in the tubes and cold fluid in the shell the heat exchanger will work with reduced performance.